Whether it's a drip at the eaves, a misted pane or a vent that won't close, we repair roof lanterns right across Bedfordshire — and agree the price in writing before any work starts.
Repairs we carry out in Bedfordshire
Leaks and weatherproofing
- Leak repairs
- Resealing
- Glazing bars and cappings
- Ridge and hips
- Eaves beams and gutters
- Upstands and kerbs
- Roof junctions
Glass, condensation and heat
Frames, vents and finishes
Inspection, maintenance and make-safe
Replacement, orangeries and commercial
Guide prices for Bedfordshire: everyday repairs such as resealing, cappings and eaves typically £165–£595 ex VAT, kerb rebuilds up to £1,295, and new lanterns from £1,995. See all guide prices.
Roof lanterns in Bedfordshire
Leaf fall from garden trees is the most common cause of eaves overflow on suburban extensions. If your lantern sits near trees, clearing the eaves channel each autumn prevents a lot of drips.
Towns we cover in Bedfordshire
Rules for lantern work in England
In England, like-for-like repairs to a roof lantern don't usually involve building control. A full replacement or a bigger opening is controlled under the Building Regulations 2010, so we set out the route in writing first. Listed buildings need listed building consent from the local council for alterations, and conservation areas can have extra controls; like-for-like repairs are treated differently from changes, so check with the council's conservation officer first. See our building regulations guide for the detail in England.
Roof lantern repairs in Bedfordshire: questions
Do you charge to look at photos?
No. Photo reviews and guide prices are free. Diagnostic visits are charged from £145 ex VAT and confirmed before we come.
What are the most common lantern problems in Bedfordshire?
Failed sealant and lifted cappings, blocked eaves drainage, kerb and roof-junction leaks, misted glass units and condensation on cold mornings.
How do I book a repair in Bedfordshire?
Send photos and your postcode by WhatsApp or the form. We reply with a guide price, then confirm a fixed price and a date in writing.